What is a Material Indent Form?

A Material Indent Form (also called Site Material Requisition / SMR or Indent Slip) is the document a site supervisor or engineer raises to request material delivery from the central store, head office or vendor. It's the gateway between the site team and the procurement / store team. Without it, materials show up either too early (cluttering the site, getting damaged), too late (work stops, mazdoors sit idle on full wages) or wrong-grade (cement of a different brand, steel of a different diameter).

On Indian sites, indents are usually paper-based — handwritten, signed, photographed and WhatsApped to the store keeper or owner. This template gives you a clean, professional PDF you can print as a pad and use site-wide.

When is it used?

Whenever site needs material that isn't already on stock — daily for fast-moving items like cement, steel and aggregate; weekly for finishing materials; one-off for specialty items like waterproofing chemicals or specific tile lots. Indents are filed and used to verify delivery challans (DC) when materials arrive.

Key fields in this indent form

  • 1. Indent number (sequential per site)
  • 2. Date raised + project / site name
  • 3. Indented by (supervisor / engineer name + signature)
  • 4. Material code, description, brand / specification
  • 5. Unit (bags / nos / kg / cum) and quantity required
  • 6. Available stock at site
  • 7. Required-by date
  • 8. Urgency (Normal / Urgent / Emergency)
  • 9. Purpose / activity / location it's needed for
  • 10. Approver name + sign-off (PM / project head)
  • 11. PO number (filled by procurement)
  • 12. Delivery confirmation / DC number (filled when received)

How to fill — step by step

  1. Check current site stock first. Don't indent what you already have.
  2. Specify the item completely — brand, grade, size. "Cement OPC 53 grade Ultratech 50kg bags" not just "cement".
  3. Compute quantity from work plan — 7-day need + 20% buffer.
  4. Mark required-by date — give procurement at least 48 hours unless emergency.
  5. Get supervisor's signature on site, then send to PM for approval.
  6. Match the DC to the indent when material arrives — file together.

Common mistakes

  • Vague specs. "Steel" gets you 8mm when you needed 16mm. Always specify diameter, grade, length.
  • No approver sign. Without sign-off, vendors deliver and PMs deny. Always get the approval column filled.
  • Indenting too late. "Need cement tomorrow" means premium prices and delays. Plan 3 days ahead.
  • Not closing the loop. Match indent to DC. Without that, theft and shortages can't be tracked.
  • Same indent, multiple times. Sequential numbering prevents duplicate orders.

How Site Setu automates this

Site Setu's Material module digitises the indent → approval → PO → delivery → consumption loop. Supervisor raises an indent on mobile, PM approves with one tap, procurement converts to PO, vendor delivers, store-keeper scans DC, system reconciles. No paper, no missed deliveries, no theft. Features · Pricing.

📖 Related reads

→ Budget Template → DPR Template → Reduce material wastage → Why projects overrun → Site Setu Pricing → All features

Stop Filling Indents Manually

Site Setu digitises indent → approval → PO → delivery — all in real time, with stock and consumption auto-tracked.

📅 Book Free Demo 💬 WhatsApp Us